Pleasant View Founder's Day 5K Run and 1 Mile Walk, Saturday June 25, 2016. Come join in for the 4th annual Founder's Day 5K Fun Run and 1 Mile Walk held in conjunction with the Pleasant View Founder's Day celebration. Runners, joggers and walkers of all abilities are invited to participate. This easy 5K course will take runners along the old canal road above Weber High School, providing beautiful views of the valley below. The one mile walk will start at the 2 mile marker of the 5K in front of Weber High School. Bring the whole family, it’s sure to be a fun time for all!
Proceeds from the race will be donated to the Juvenile Diabetes Foundation as well as the Boy Scouts of America. Please join us in helping these organizations.
Pleasant View Founders Day, June 25, 2016 10:00 am, Join the Pleasant View Founder's Day celebration. Bring the whole family, it’s sure to be a fun time for all!
I-15: Box Elder Project Corridor Activities
•Day and nighttime construction activities are expected in all areas
• Speed limit: 65 MPH along the construction corridor
• Clear, grub, excavation, backfill, barrier, storm drain activities
• Fencing, sign relocation, paint and tape removal
• Asphalt and concrete paving
• Bridge and utility work continue along the construction corridor
• Intermittent, nighttime, single lane configuration
I-15: Farr West – Brigham Single Lane Closures: Bridge and Paving Activities
Crews have begun paint and tape removal with concrete paving continuing along the construction corridor through fall 2016.
• Intermittent, nightly, single lane configurations in 3 mile segments
• North and southbound
• Sunday - Saturday
I-15: Bridge Work Continues
Bridge work continues along the I-15 Box Elder corridor with day and nighttime activities expected to take place in all areas. Motorists and residents may experience an increase in noise, light, dust, vibration, construction personnel, vehicles and machinery in the area.
Wide Load Restrictions: Trucks with loads wider than 11' are required to have an escort while driving through the construction corridor (2700 North in Farr West to 1100 South in Brigham City).
Construction schedules are subject to change due to weather, equipment or material delays.
Safety Reminder: For your safety and the safety of those working in the area, please exercise caution, stay alert and be prepared for changing lane configurations throughout the construction corridor.