Error message

Perry Hometown News - October

Wednesday, October 5, 2016 - 9:00am
Dawn Scothern / newletters

Three Mile Creek Elementary PTA is bringing back its Halloween Carnival this year!!  It will be on            Friday October 28th from 5:30pm to 8pm at Three Mile Creek Elementary!! There will be more                   given later at the school.  Please call or text Kira Alldredge 435-730-1197 for further details.  Everyone is welcome!

 SCHOOLS ARE IN SESSION so drive cautiously as children will be walking and biking as they are going to and from school.

We appreciate everyone that has conserved in their consumption of secondary water. We have been notified that Pine View Secondary water will be shut off around October 15th this year.

            THREE MILE CREEK GUN RANGE: Long Range Rifle shooting has been suspended for the time being. However, Trap Shooting and Short Range Pistol Shooting will be available to the public on weekends as noticed on the Perry City Website and by appointment.

            Refer-A-Friend Program Coming Soon! Refer a friend to UTOPIA FIBER and you both get a $25 Amex Gift Card!

 

Gain A Lane project on I-15 update:

 

The project is currently 82% complete with concrete being placed and cured along a significant portion of the freeway from Willard to Brigham City.  In order for the outer auxiliary lanes to be constructed, traffic has been switched onto the new pavement in several areas along the Box Elder construction corridor.

We encourage you to pay particular attention to your following distances throughout the project corridor; construction vehicles entering and leaving the highway, traffic often comes to an abrupt slowdown.

The I-15: Box Elder Project is projected to reach substantial completion November 30, 2016 with additional striping and bonding scheduled to take place in Spring 2017.

 

Farr West – Brigham

 

Day and nighttime construction activities are expected in all areas. Speed limit: 65 MPH along the construction corridor. Clear, grub, excavation, backfill and barrier. Fencing, sign relocation, paint and tape removal/installation with asphalt and concrete paving. Bridge and utility work continue along the construction corridor, with intermittent, nighttime, single lane configuration.

 

I-15: New Traffic Configurations - Traffic Shifts

 

Northbound – Southbound Along the Construction Corridor

In order for the outer auxiliary lanes to be constructed, construction crews have shifted motorists to new concrete pavement in several areas along the corridor.

   

I-15: Exit 351 - Willard, Pleasant View (Near Smith and Edwards)

 

Work on I-15 on and off-ramps at Exit 351 are scheduled to continue through late October. Maintenance of Traffic devices, construction personnel and equipment are onsite.  Southbound on-ramp traffic has been shifted to the outside of the travel lane. All northbound and southbound ramps continue to remain open.

 

Single Lane Closures: Bridge and Paving Activities 

 

Crews continue bridge activities, paint/tape installation, concrete paving and shoulder work along the construction corridor through late November 2016. Intermittent, nightly, single lane configurations in 3-mile segments both north and southbound with daytime and nighttime activities. (Sunday – Saturday)

 

I-15: Farr West to Brigham City - Bridge Work Continues 

 

 

Bridge work continues along the I-15: Box Elder corridor with day and nighttime activities expected to take place in the area. Motorists and residents may experience an increase in noise, light, dust, vibration, construction personnel, vehicles and machinery in the area. 

 

I-15 Bridge: 2950 South – Perry

 

Bridge work at 2950 South is projected to continue through Fall 2016. Motorists traveling east and west under the bridge may encounter a closure and/or lane restrictions. Activity in the 2950 South area is projected to take place through October, maintenance of traffic personnel may be onsite to direct east and west direct traffic under the bridge. Daytime and nighttime activities may take place. Intermittent, single lane configurations north and southbound will take place on I-15 near the 2950 South Bridge.  Detour Route: 2700 South

 

I-15 Bridge: 750 North – Willard

 

Bridge work at 750 North is projected to continue through Fall 2016.Motorists traveling east and west under the bridge may encounter intermittent closures and/or lane restrictions. Activity in the 750 North area is projected to take place through October, Maintenance of Traffic personnel may be onsite to direct east and west direct traffic under the bridge. Daytime and nighttime activities may take place with intermittent, single lane configurations north and southbound will take place on I-15 near the 750 North Bridge. Detour Route: US 89

 

I-15 Bridge: 7800 South – Willard

 

Bridge work at 7800 South is projected to continue through Fall 2016. Motorists traveling east and west under the bridge may encounter intermittent closures and/or lane restrictions, the activity in the 7800 South area is projected to take place through October. Maintenance of Traffic personnel may be onsite to direct east and west direct traffic under the bridge with daytime and nighttime activities taking place. Intermittent, single lane configurations north and southbound will take place on I-15 near the 7800 South Bridge. Detour Route: 8700 South – 1500 West

 

I-15 Bridge: 8700 South – Willard

 

Bridge work at 8700 South is projected to continue through Fall 2016. Motorists traveling east and west under the bridge may encounter intermittent closures and/or lane restrictions, with activity in the 8700 South area is projected to take place through October. Maintenance of Traffic personnel may be onsite to direct east and west direct traffic under the bridge with there being daytime and nighttime activities likely taking place. Intermittent, single lane configurations north and southbound will take place on I-15 near the 8700 South Bridge.  Detour Route: 7800 South – 1500 West

 

I-15: Perry Rest Area

 

Utility work and concrete paving is scheduled to continue at the northbound Perry Rest Area through Fall 2016.  The Rest Area will remain open with limited parking available.

 

Tags: